Studies on the improvement and development of water facilities in the villages of rural water supply complexes in Semnan province
100%
- 15km
- The total length of piping
- PE
- Pipes Material
- From 63 mm to 250 mm
- Used diameters
- 500cubic meters
- The total volume of concrete reservoir
- Miami County
- Range of studies
- 5000people
- Population covered