Detailed design on Raw water for green spaces in Hashtgerd City
Second Phase Studies on Raw water for green spaces in Hashtgerd City
100%
- 95
- The total length of piping
- polyethylene
- Pipes Material
- 63 to 355
- Used diameters
- 4000 cubic meters
- The total volume of concrete reservoir
- 3 pumping stations with a total power of 240 kW
- Pumping station specifications