Preliminary & Detailed design of the green area water supply project of Sadra, Fars province
Studies of the first and second stage of the green area water supply project of Sadra, Fars province
100%
- 160
- The total length of piping
- polyethylene
- Pipes Material
- 63 to 450
- Used diameters
- 10,000 cubic meters
- The total volume of concrete reservoir
- There are 3 pumping stations and 3 wellhead chambers with a total capacity of 160 kW
- Pumping station specifications